General contractor: Layton Construction Architect: Insight architects This project added a 9,700 square foot new facility in Nampa, ID. Steve Pavlick at INSIGHT designed three procedure rooms and twelve preparatory/recovery bays in a clerestory area with natural daylighting to save energy and provide abundant light.
General contractor: Layton Construction Architect: ADP Architect, PA Performed interior wood framing build out. The build out included new offices and a second floor inside of an existing warehouse.